![](https://static.wixstatic.com/media/11062b_06ba851b8adf4d11816ea8b9bb9b5398f000.jpg/v1/fill/w_665,h_374,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/11062b_06ba851b8adf4d11816ea8b9bb9b5398f000.jpg)
Our Services
As part of our continuous improvement and progression, a critical avenue that has developed vastly over the years is to anticipate specific work job and to provide clients with commercially healthy proposals to minimizing any form of down-time and to facilitate a safe working environment through the journey of the work scope.
STRUCTURAL STEEL Fabrication & Erection
![STEEL STRUCTURE.jpeg](https://static.wixstatic.com/media/42dc22_0b93732cbc1b4db995f704e6b9892fc4~mv2.jpeg/v1/fill/w_287,h_311,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/STEEL%20STRUCTURE.jpeg)
-
Design Engineering
-
Development of Shop Drawings
-
Material Procurement
-
Fabrication
-
Galvanization and/or Painting
-
Installation at Site
-
Quality Control Documentation & Handover to Client
We can do a professional job in completing with the client’s upmost satisfaction in the most cost-effective and quickest way.
PLANT EQUIPMENT INSTALLATION
STATIC EQUIPMENT
![STATIC EQUIPMENT](https://static.wixstatic.com/media/42dc22_86031a9c08224fce83dc557c2064fe5a~mv2.jpeg/v1/fill/w_328,h_246,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/STATIC%20EQUIPMENT.jpeg)
-
Foundation Chipping
-
Padding
-
Erection
-
Alignment
-
Grouting
-
Platform & Ladder dress-up
-
Internal Tray installation and
-
Distributor Pipe Installation
ROTATING EQUIPMENT
![ROTATING EQUIPMENT.jpeg](https://static.wixstatic.com/media/42dc22_ea03c2ff50cf409eae5201d849ff4458~mv2.jpeg/v1/fill/w_185,h_246,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/ROTATING%20EQUIPMENT.jpeg)
Erection of,
-
Pumps
-
Compressors
-
Agitator and
-
Alignment and Pre-commission Assistance
PACKAGE ITEMS - GTG, HRSG PACKAGE, AIR FIN COOLERS
![PACKAGE ITEMS](https://static.wixstatic.com/media/42dc22_5243e9af2bc54e5591ff26e9e444b609~mv2.jpeg/v1/fill/w_328,h_246,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/PACKAGE%20ITEMS.jpeg)
-
Pre-assembly
-
Erection
-
Fan & Motor Alignment
-
Flare Stacks - Erection & Alignment including Derrick Structure & Flare tip installation
-
Heater & Reformer installation
-
Loading & Unloading Arms installation
PIPING (SS & CS) Fabrication & Installation
![Piping - 7.jpeg](https://static.wixstatic.com/media/42dc22_d7d85d2d101a4fa3b44eaf14ef90b191~mv2.jpeg/v1/fill/w_233,h_311,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/Piping%20-%207.jpeg)
Pipe fabrication demands a high level of precision among hundreds of components with equally challenging assembly and installation processes, which includes cutting, beveling, welding, and bending (or other pipe forming operations); and is performed by skilled tradespeople.
Pipe Installation which consists of Installation of Pipe Flanges, Valve & Equipment Flange Connections, Pipe Supports, Pressure testing, Insulation, Painting, Marking & Identification and Installation of Expansion Joints and Vents & Drains.
STEEL TANKAGES Fabrication & Erection
![TANKAGES & SPHERICAL TANK ERECTION](https://static.wixstatic.com/media/42dc22_763b2a6b9e764faa985311dad49cfc6a~mv2.jpg/v1/fill/w_233,h_311,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/TANKAGES%20%26%20SPHERICAL%20TANK%20ERECTION.jpg)
Fabrication, Erection and Testing of the Storage Tank activities need to be carried out with utmost care with good workmanship and in accordance with the specifications, starting from material identification, marking, cutting, rolling, and welding.
​
Erection work involves starting from shifting rolled shell plates to tank foundation area, align the shell plates, fit up & welding, Peaking, Plumpness, Circumference checking and Nozzle installation by qualified working personnel.
SOLAR PANEL WORKS
![SOLAR PANEL INSTALLATION](https://static.wixstatic.com/media/42dc22_c703f24a730541f581a5b9e797e671ed~mv2.jpeg/v1/fill/w_287,h_129,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/SOLAR%20PANEL%20INSTALLATION.jpeg)
Panel Installation & Electrical Wiring
Our services include PV Mounting Structure Installation on Metal/RC with ballast/Water Tank / Waterproof Felt, PV Panel installation, termination, and cable connection with proper cable management, AC/DC cable laying, Installation & Termination, Installation of New Inverter, Isolator, Metering Board, ACDB at Roof Top & MSB/MCCB, Installation of Monitoring system and Lightning Protection
FACILITY MANAGEMENT (Plant Maintenance)
![Facility Management - Plant Maintenance.jpeg](https://static.wixstatic.com/media/42dc22_1be42336a5fd406aa56a204523cc38cb~mv2.jpeg/v1/fill/w_328,h_246,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/Facility%20Management%20-%20Plant%20Maintenance.jpeg)
Committed to the approach of diversifying and providing a value ended service to our Petrochemical and Pharmaceutical clients, Skyrus Engineering and Construction ventured into Facilities Management since 2020. The concept of Facilities Management was coupled with the ability to provide our clients with the relevant services they required in terms of reinforcement and A&A (Addition and Alteration) to exploring new opportunities within the process industry to be a one-stop solution for our clients.
The Facilities Management team also functions as Plant Maintenance by operating in not only within the jurisdiction of the non-process but also the process end. This holistic approach for maintenance has allowed us to strengthen our bond with our respective clients and to work with the various Main/Sub-Contractors of different trades.
​
The dedication of the Facilities/Plant Maintenance team is a core reason for our continuous expansion in terms of resource and client base. The attribute is well recognised by the entire Skyrus Engineering and Construction family and the core principle of everlasting improvement is instilled in all stakeholders of the team.
FACILITY MANAGEMENT (Building & Architectural Works)
![Facilities Management -Building & Civil Works](https://static.wixstatic.com/media/42dc22_3f36427d21c54379980ba81db42ad115~mv2.jpeg/v1/fill/w_328,h_246,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/Facilities%20Management%20-Building%20%26%20Civil%20Works.jpeg)
-
False Ceiling
-
Metal/Wooden/Glass Door (Fire-Rated / Blast Rated)
-
Fire Protection System (Smoke/Heat Detector/NCM Card/Troubleshooting)
-
Gypsum/Partition Wall Repair (With Insulation)
-
Waterproofing (Membrane / Torch-On application)
-
PU Injection Grouting
-
HVAC System (CFU/AHU/VRV/VRF/Cooling Tower/Chiller System)
-
Tiling Works (Ceramic/Homogeneous/Corrosion-Proof/Vinyl)
-
Roofing and Skylight Panel System (Installation and Repair)
-
System/Office and In-Built (Pantry) Furniture
-
Plumbing System (Installation and Repair)
-
Electrical System (Installation and Alteration to Main/Sub DB with LEW Endorsement)
FACILITY MANAGEMENT (Civil & Earth Works)
![61.jpeg](https://static.wixstatic.com/media/42dc22_8ef2b5b6a328474c9a7bf27b8979a52b~mv2.jpeg/v1/fill/w_328,h_219,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/61.jpeg)
-
Epoxy and Injection Grouting
-
Corrosion Proof Painting
-
Fire-Proofing Works (Cementitious and Membrane)
-
PBFC/OPC Concrete System Foundation (Pre-Cast / In-Situ)
-
Anchor Bolt System (Pre / Post Casting)
-
Surveying Reports
-
Asphalt & Road Works (With Thermoplastic Application)
-
Duct-Bank, Catch-Basin, and Pipe Culvert-Concrete System (Cable/Sewer/Manhole Pit)
-
Chain-Link and Zinc Fencing System
-
Landscaping
-
Demolition and Disposal Works