top of page
![](https://static.wixstatic.com/media/42dc22_4dc7fc6c8c4048c4ad179206abdffb01~mv2.jpeg/v1/fill/w_864,h_679,al_c,q_85,enc_auto/42dc22_4dc7fc6c8c4048c4ad179206abdffb01~mv2.jpeg)
4. Piping (SS & CS)
Pipe fabrication demands a high level of precision among hundreds of components with equally challenging assembly and installation processes, which includes cutting, beveling, welding, and bending (or other pipe forming operations); and is performed by skilled tradespeople.
Pipe Installation which consists of Installation of Pipe Flanges, Valve & Equipment Flange Connections, Pipe Supports, Pressure testing, Insulation, Painting, Marking & Identification and Installation of Expansion Joints and Vents & Drains.
bottom of page